REB 2000

THE FIRST STAGE OF MODERNISATION

  • The following installations were modernized: atmospheric and vacuum distillation, catalytic reformation, viscosity reduction, petrol hydrofining, electric desalinization;
  • Modern catalysts were purchased;
  • Specific treatments were applied for the process and water (raw, recirculated, boiler and waste water);
  • New equipment was purchased.

The cost of investments made until 1998 was of ~35 million USD, from which 20 million USD for the environment protection; the funding was provided by the company own sources.

The main effects of the accomplished modernization were:

1. The increase of yields in white petroleum products by ~11,5 %;

2. The reduction of processing costs in the refinery by ~ 2 USD / ton of crude oil.

3. The reduction of technological consumptions and specific consumptions of energy and utilities:

The thermic energy consume … with 45 %

The combustional gases consume with 56 %

The electric energy consume with 24 %

The methane gas consume

 

Previous pageNext page


This book is the result of the proceedings of the Romanian Environmental Forum, 6th edition held in Bucharest between 16 and 19 November 1999.